A Closer Look at the Butler Builder's Construction Resources

You don’t need to guess at tolerances or chase down a manufacturer’s support line mid-build. As an authorized Butler distributor, AM Star gives builders direct access to specs, component documentation, and an engineering contact who already knows the project.

Builder's Guide at a glance

What each section of the Builder's Guide covers
Section What it covers
1. Selecting Building Manufacturer A 10 point evaluation guide covering structural tolerances, standing seam roof performance, factory priming standards and single source engineering accountability
2. Items to Verify Prior to Ordering Permit drawings the customer reviews and approves: building codes and loads, colors and panels, the parts and panel checklist, and building dimensions, clearances and structural locations
3. Preparing for Building Delivery Shortage and damage reporting (within 24 hours of delivery, and 10 days for hardware in sealed boxes), clear access for a 68 foot semi truck, and panel storage and handling
4. Preparing for Metal Building Installation 21 requirements covering foundation and slab, site access and grading, logistics and utilities, and scope and terms
5. Quality Control During Building Installation A certified assembly contractor with at least 5 years of experience, and engineering observation by AM Star at $1,500 per visit, with at least 3 visits recommended
6. Maintaining Your Butler Building Structural components, general roof maintenance and wall system maintenance
7. Butler Building Warranty The optional Watertight Gold Endorsement for qualifying roof systems, with a minimum roof slope of 1/4:12 for MR-24, VSR II and CMR-24

Resources for Your Butler Metal Building Project

Whether you’re planning a new project, replacing existing components, or maintaining a Butler metal building, having the right information can make the process easier. Our Builder’s Guide provides helpful resources covering Butler building panels, parts, accessories, installation, and maintenance.

Explore the guides below to find information relevant to your project.

Butler Building Guide

What to confirm on structural steel, panel systems, and fasteners before ordering.

learn more
Butler Installation Guide

Download if you need a full walkthrough of how Butler Building Installation works.

learn more
Spec & Component Guide

What to confirm on structural steel, panel systems, and fasteners before ordering.

learn more
See All resources
Section 01 · Pre-Purchase Due Diligence

Selecting Building Manufacturer

Download 10 things to know before you buy

Before committing to a pre-engineered metal building manufacturer, review our essential 10-point evaluation guide covering structural tolerances, standing-seam roof performance, factory priming standards, and single-source engineering accountability.

10 THINGS TO KNOW BEFORE YOU BUY
Section 02 · Pre-Order Permit Drawing Requirements

Items to Verify Prior to Ordering

Customer has verified and approved the following permit drawings (Initial Each)

Colors and Panels per Permit Drawings (Roof, Wall, Trim) Frames not Painted, Shipping Primer Only
Building Codes and Loads
Parts and Panel Checklist

Roof Panels, Wall Panels, Base Trim, Roof Projection Soffits, Gutter and Gable Eave, Downspouts, Window Trim, Man Door Trim, Framed Opening Trim, Overhead Door Trim, Building Corner Trim

Dimensions, Clearances & Structural Locations

Building Dimensions (Height, Width, Length), Interior Column and Rafter Clearances, Door Locations and Heights, Window Locations and Heights, Framed Opening Locations, Bracing Conditions

Standard Factory Finish Notes

NOTE: Man Doors only come primed, Beige (not an Option)

Windows only come in Bronze (not an option)

Louvers only come in Birch White (not an option)

Roll-Up Doors come in standard colors to be selected by End Customer.

End Customer Plan Review, Fabrication Compliance & Permitting Responsibility

The End Customer shall review the accuracy of the plans as to what materials are being provided and what is or is not included. AM Star Construction, Inc. and its Manufacturer are responsible for the fabrication of the building components in compliance with the approved shop drawings only. Exceeding on or not exceeding any architectural plans, governmental approval, and specifications is the responsibility of the End Customer.

Permitting and Inspections are the sole responsibility of the End Customer as well. All changes must be made in writing.

Section 03 · Freight, Staging & Material Protection

Preparing for Building Delivery

Materials delivered are the property of End Customer to protect against theft and damage until installed.

Panel & Shipment Shortage Reporting Window

Within 24 Hours

Photographed prior to truck unload (per Kingspan Drawings)

Hardware in Sealed Boxes Claim Window

Within 10 Days

End Customer verification of all sealed hardware boxes

Required Project Site Truck Access

68' Semi-Truck

Clear access for 68′ truck & trailer next to building slab

The End Customer is responsible for the verification of all shipments received. Shortages must be reported (see the attached Kingspan Drawings for review and approval) within 24 hours of delivery and 10 days for hardware in sealed boxes. All damage shall be photographed prior to truck unload. After such time, End Customer agrees all materials have been received and releases all claims of shortages or damaged materials. Prior to delivery, it is the End Customer’s duty to provide clear access for a 68′ truck and trailer semi-truck to the project site. Curb side delivery to jobsite does not include unloading. There will be an extra charge for this work. It is important to unload next to building slab. Picking up and moving materials twice or hand-picking materials for long distances will be an extra expense. In the event, your building has been fabricated, and you cannot accept delivery. Weekly storage and trailer fees shall become due. The manufacturing plant does not have the capacity to store buildings. All delivery disputes are between freight forwarder and end customer.

Panel Delivery, Storage, and Handling

Mandatory field procedures to prevent moisture condensation, panel buckling, or coating damage.

Delivery

All panels and accessories should be bundled for shipment and storage. Paper wrapping is used to protect the bundled material from dirt and moisture. Plastic or any other non-breathing material is not to be used for wrapping of bundles. (These materials prevent air passage and may tend to trap moisture in the bundle.) The top wrapping sheet of each bundle should lap over the bottom paper, so as to prevent rainwater from entering the bundle. All panel bundles should be accompanied by a tag or other listing that clearly describes each bundle’s contents.

Each bundle should be inspected upon receipt, and any damage, corrosion, or wet material must be noted on the delivery documents. Wet material must be dried according to the manufacturer’s instructions. Panels and accessories should not be stored in a wet condition.

Storage

It is recommended that panel bundles be stored under a roof whenever possible. If panel bundles are stored outside, the following list of requirements should be adhered to:

The storage area should be reasonably level and should be located so as to minimize handling of bundles during the construction process.

When stored on bare ground, place a plastic ground cover under the bundles to minimize condensation on the panels from moisture in the soil.

Store bundles at least 12 inches above ground level to allow air circulation beneath the bundle, and to prevent rising water from entering the bundle.

Elevate one end of the bundle slightly to permit runoff of moisture from the top of the bundle or from between nested panels. Water-resistant paper will not provide long-term resistance to moisture penetration from puddled water on top of the bundle. A waterproof cover should be placed over the bundles, with allowance for air circulation under the cover.

Inspect stored bundles daily and repair any tears or punctures in the water-resistant wrapping with a compatible waterproof tape.

Re-cover opened bundles at the end of each day to prevent entry of moisture.

Handling

Proper care is required in unloading and handling panel bundles in order to prevent panel damage. The panel manufacturer’s instructions regarding bundle handling must be complied with at all times. The following list is a summary of basic handling requirements:

Bundles should remain banded during any handling, and until the individual panels in each bundle are ready to be installed. Bundles should never be lifted by the banding.

Lift each bundle as close as possible to its center of gravity.

If the panel bundles are to be lifted with a crane, use a spreader bar of appropriate length, and nylon band slings. (Do not use wire rope slings as they will damage the panels.)

Depending on panel length, some bundles may be lifted by a forklift. (Consult panel manufacturer for length limitations.) When using a forklift, the forks should be spread apart to their maximum spacing, and the load must be centered on the forks.

After panel bundles are opened, individual panels must also be handled carefully to prevent panel buckling or damage to the panel coating. When removing a panel from a bundle, it should never be allowed to slide over another panel. The individual panels should be “rolled” off the top of the bundle to prevent scratching the next panel. A panel should never be picked up by its ends. Instead, lift the panel along its longitudinal edge and carry in a vertical (not flat) position. For panels over 10 feet long, two or more people should lift the panel along the same edge.

To avoid permanent black fingerprinting of the Galvalume coating, soft gloves must be worn when handling unpainted Galvalume Plus® panels.

Delivery

All panels and accessories should be bundled for shipment and storage. Paper wrapping is used to protect the bundled material from dirt and moisture. Plastic or any other non-breathing material is not to be used for wrapping of bundles. (These materials prevent air passage and may tend to trap moisture in the bundle.) The top wrapping sheet of each bundle should lap over the bottom paper, so as to prevent rainwater from entering the bundle. All panel bundles should be accompanied by a tag or other listing that clearly describes each bundle’s contents.

Each bundle should be inspected upon receipt, and any damage, corrosion, or wet material must be noted on the delivery documents. Wet material must be dried according to the manufacturer’s instructions. Panels and accessories should not be stored in a wet condition.

Storage

It is recommended that panel bundles be stored under a roof whenever possible. If panel bundles are stored outside, the following list of requirements should be adhered to:

The storage area should be reasonably level and should be located so as to minimize handling of bundles during the construction process.

When stored on bare ground, place a plastic ground cover under the bundles to minimize condensation on the panels from moisture in the soil.

Store bundles at least 12 inches above ground level to allow air circulation beneath the bundle, and to prevent rising water from entering the bundle.

Elevate one end of the bundle slightly to permit runoff of moisture from the top of the bundle or from between nested panels. Water-resistant paper will not provide long-term resistance to moisture penetration from puddled water on top of the bundle. A waterproof cover should be placed over the bundles, with allowance for air circulation under the cover.

Inspect stored bundles daily and repair any tears or punctures in the water-resistant wrapping with a compatible waterproof tape.

Re-cover opened bundles at the end of each day to prevent entry of moisture.

Handling

Proper care is required in unloading and handling panel bundles in order to prevent panel damage. The panel manufacturer’s instructions regarding bundle handling must be complied with at all times. The following list is a summary of basic handling requirements:

Bundles should remain banded during any handling, and until the individual panels in each bundle are ready to be installed. Bundles should never be lifted by the banding.

Lift each bundle as close as possible to its center of gravity.

If the panel bundles are to be lifted with a crane, use a spreader bar of appropriate length, and nylon band slings. (Do not use wire rope slings as they will damage the panels.)

Depending on panel length, some bundles may be lifted by a forklift. (Consult panel manufacturer for length limitations.) When using a forklift, the forks should be spread apart to their maximum spacing, and the load must be centered on the forks.

After panel bundles are opened, individual panels must also be handled carefully to prevent panel buckling or damage to the panel coating. When removing a panel from a bundle, it should never be allowed to slide over another panel. The individual panels should be “rolled” off the top of the bundle to prevent scratching the next panel. A panel should never be picked up by its ends. Instead, lift the panel along its longitudinal edge and carry in a vertical (not flat) position. For panels over 10 feet long, two or more people should lift the panel along the same edge.

To avoid permanent black fingerprinting of the Galvalume coating, soft gloves must be worn when handling unpainted Galvalume Plus® panels.

Section 04 · Pre-Mobilization Assembly Accommodations

Preparing for Metal Building Installation

Assembly Per Enhanced Assembly Drawings Not Permit Set

Foundation & Slab

Anchor Bolt locations and templates following the PEMB (enhanced assembly drawing) plans for locations and concrete foundation drawings

Foundation & Slab

Anchor Bolt locations and templates following the PEMB (enhanced assembly drawing) plans for locations and concrete foundation drawings

Site Access & Grading

The site is graded flat and compacted for a two wheel forklift and scissor lift. Lifts will not work on soft and uneven ground.

Foundation & Slab

Anchor Bolt locations and templates following the PEMB (enhanced assembly drawing) plans for locations and concrete foundation drawings

Site Access & Grading

Drainage measures have been provided to keep site accessible.

Site Access & Grading

Clear access to and unobstructed work hours allotted for part of assembly.

Site Access & Grading

Landscaping such as trees, plants, and brush have been cleared. Assembly contractor is not responsible for damage to existing concrete, asphalt, hardscape or softscape or underground utilities. Non-skid tires are not included as part of assembly.

Logistics & Utilities

End Customer is there to confirm bill of lading and no damage or shortages are present.

Logistics & Utilities

Site is secured by fence including public walkways and barricades are set and any other means for safety are taken by End Customer. Delivered materials belong to End Customer. Theft and damage from job site is out of Assembly contractor’s control and shall not be held liable for.

Scope & Terms

Building permits have been obtained and Special Inspection requirements in place.

Logistics & Utilities

A Dumpster or stockpile location is provided for excess packing materials and scrap pieces within 25′ of building slab.

Logistics & Utilities

Sanitary Facilities are provided on site for workers.

Logistics & Utilities

Electric Power source for hand tools.

Scope & Terms

Field welding and touch-up of shop transportation primer not part of scope. Shop coat primer is meant for transportation purposes only. Scratched panels shall be touched-up as normal assembly sequence if required.

Scope & Terms

Normal standards of sequencing are allowed for ultimate performance.

Scope & Terms

All MBMA codes of standard practice are to be followed.

Scope & Terms

Any scuff marks or dirt on steel or slab is not the responsibility of AM Star or Butler. Owner must hire professional painter to clean and paint steel as required.

Scope & Terms

Any material shortage claims or damage to building component claims shall be limited to the replacement of such parts. No liquidated or consequential damages are accepted and shall be considered excusable delay.

Scope & Terms

Excess Materials property of Manufacturer or AM Star and shall be dumped on site or removed.

Scope & Terms

No Prevailing Wage Requirements or Certified Payroll Reporting are included in assembly.

Scope & Terms

It is agreed Restricted site access will increase assembly contract price for rigging and labor.

Foundation & Slab

Anchor Bolt locations and templates following the PEMB (enhanced assembly drawing) plans for locations and concrete foundation drawings.

Foundation & Slab

The slab and perimeter are clear of all obstructions within a 25 foot perimeter for assembly of steel. Building unloading must be next to slab. Moving materials twice will incur an extra charge for inefficiency. Building slab shall also be clear of all obstructions and equipment before and during steel assembly.

Foundation & Slab

Perimeter ramp shall be provided to drive onto building slab.

Site Access & Grading

The site is graded flat and compacted for a two wheel forklift and scissor lift. Lifts will not work on soft and uneven ground.

Site Access & Grading

Drainage measures have been provided to keep site accessible.

Site Access & Grading

Clear access to and unobstructed work hours allotted for part of assembly.

Site Access & Grading

Landscaping such as trees, plants, and brush have been cleared. Assembly contractor is not responsible for damage to existing concrete, asphalt, hardscape or softscape or underground utilities. Non-skid tires are not included as part of assembly.

Logistics & Utilities

End Customer is there to confirm bill of lading and no damage or shortages are present.

Logistics & Utilities

Site is secured by fence including public walkways and barricades are set and any other means for safety are taken by End Customer. Delivered materials belong to End Customer. Theft and damage from job site is out of Assembly contractor’s control and shall not be held liable for.

Logistics & Utilities

A Dumpster or stockpile location is provided for excess packing materials and scrap pieces within 25′ of building slab.

Logistics & Utilities

Sanitary Facilities are provided on site for workers.

Logistics & Utilities

Electric Power source for hand tools.

 
Scope & Terms

Building permits have been obtained and Special Inspection requirements in place.

Scope & Terms

Field welding and touch-up of shop transportation primer not part of scope. Shop coat primer is meant for transportation purposes only. Scratched panels shall be touched-up as normal assembly sequence if required.

Scope & Terms

Normal standards of sequencing are allowed for ultimate performance.

Scope & Terms

All MBMA codes of standard practice are to be followed.

Scope & Terms

Any scuff marks or dirt on steel or slab is not the responsibility of AM Star or Butler. Owner must hire professional painter to clean and paint steel as required.

Scope & Terms

Any material shortage claims or damage to building component claims shall be limited to the replacement of such parts. No liquidated or consequential damages are accepted and shall be considered excusable delay.

Scope & Terms

Excess Materials property of Manufacturer or AM Star and shall be dumped on site or removed.

Scope & Terms

No Prevailing Wage Requirements or Certified Payroll Reporting are included in assembly.

Scope & Terms

It is agreed Restricted site access will increase assembly contract price for rigging and labor.

Section 05 · Certified Assembly contractor & Structural Engineering Observation

Quality Control During Building Installation

Certified Assembly contractor Standard (Min. 5 Years Exp.)

A certified Manufacturer’s Assembly contractor of the building and components must be used to install your building with 5 years’ experience.

Ensures strict adherence to enhanced assembly drawings, MBMA standards of practice, and weathertight roof seam installation.

AM Star Engineering Observation & Certification

All structural work will require engineering observation and certification by AM Star at $1,500 per visit. It is recommended that at least 3 site visits occur prior to concrete pour, prior to paneling, and at completion for quality control.

Milestone 01
Prior to Concrete Pour
Milestone 02
Prior to Paneling
Milestone 03
At Completion for Quality Control
Section 06 · Lifecycle Care, Inspections & Structural Integrity

Maintaining Your Butler Building

With springtime finally here, you can count on frequent rain showers, so it is important to remember a few things regarding your customer’s metal building or metal roof. Getting in front of your customer to inspect their roof can often lead to more business.

metal roof panel system

Now That You’re Ready to Head Out and Inspect Some Roofs, Here are a Few Suggestions on What to do and What to Look For:

Connect with the Building Occupant
1
The first thing to do is always check in with the building occupant for safety reasons, as well as common courtesy. Ask if there have been any leaks reported and if they could provide a leak map. This will help you while on the roof and track your efforts in stopping leaks or perceived leaks.
Determine if it’s a Leak or Condensation
2
It is important to remember that some leaks are not actually leaks but condensation. Late in the winter season and springtime are times of the year with high humidity. This year, some areas of the country experienced colder than normal temperatures creating unique conditions for buildings not designed for thermal efficiency, leading to condensation issues. The building occupant may think the condensation is a leak, so it is important to ask questions before getting on the roof.
Examine Possible Weather Damage
3
Heavy snow and ice can cause significant damage during a bad winter. While on the roof, you should inspect all penetrations and curbs for any damage to the base connection or any curb-mounted items to ensure they are still properly sealed. This includes skylights, pipe flashings, exhaust fans, and seam-mounted equipment. Be sure all fasteners are secure and haven’t backed out and that all sealant and joints appear to be in good shape.
Don’t Forget to Clear Debris
4
Clear all debris from the roof. This includes items left by tradesmen and leaves or branches from storms which may ultimately mean cleaning the gutters. Make sure any gutter strainers are in place as they are often moved by melting ice and snow.
Check for Signs of Rust and/or Corrosion
5
Check the roof for surface rust. Springtime is a good time to touch up roof panels or other roof-mounted equipment that might be showing signs of rust that could cause premature corrosion of your metal roof panels. Galvalume® should be treated with Uniflex® and painted panels can be touched up with air-dry Kynar® touch-up paint. It is also important to walk the roof and make sure there are no holes from random bullets or other flying debris. Small holes are often hard to detect unless a leak has been reported.
Inspections Are Critical
6

Be sure to inspect the eave fasteners, ridge fasteners, and splice nuts to make sure all are intact. Finally, be sure to inspect the downspouts to make sure they are intact and properly anchored to the wall and drain tiles.

Having a crew that can conduct spring inspections is a great way to stay in touch with your current customers. Not to mention, it is a proven fact that doing routine maintenance typically leads to new work. Make sure to advise the occupant when you’re leaving the property and drop off your report or findings. Leave a business card and let them know you can handle all their maintenance needs. Staying in front of your customers also ensures others don’t get the opportunity to service them, because you’re not there.

In closing, I want to come back to the subject of safety and remind everyone not to do perimeter inspections without proper fall protection. There are several companies that supply detachable rigs that allow you to tie off to conduct your work in the safest manner possible.

I am here to help you with all of your roofing needs. Contact me at mikeachkar@gmail.com.

Maintaining Butler Structurals

The structural components of a Butler® building will seldom require maintenance other than repair of possible physical damage or the occasional repainting of structurals that are exposed to the weather or to unusual atmospheric conditions. However, it is important to keep in mind that alterations or additions to your building after the original construction may affect the structural integrity of the building and should be properly engineered by a design professional. Your Butler Builder® dealer can assist you in the planning and execution of such alterations or additions. Alterations requiring professional assistance will usually fall under one of three categories and examples of alterations within each of the categories are as follows:

Category 01
Additions That Add Load to Structural Components
  1. Addition of roof-mounted heating, ventilating, or air conditioning units.
  2. Addition of piping, duct work, suspended ceilings, unit heaters, or other utilities supported from the roof purlins.
  3. Addition of craneways, hoists, or jib cranes supported by the building structurals.
  4. Construction of an adjacent wall or building creating a stepped elevation that may result in excessive snow accumulation on the lower elevation.
Category 02
Alternations Entailing Removal or Relocation of Essential Building Components
  1. Removal or relocation of brace rods.
  2. Removal or relocation of wall girts.
  3. Removal or relocation of building columns.
  4. Removal or relocation of flange braces.
Category 03
Alternations or Additions Detrimental to the Structural Capacity of Load Carrying Components
  1. Cutting holes or notches in structural components for passage of utilities.
  2. Deformation of components to provide clearance for pipe hangers or other connecting devices.
  3. Eccentric loads applied to beams or columns.
     

General Roof Maintenance

The roof of your Butler® building is an area that is seldom seen and consequently too often forgotten in planning routine building maintenance. Butler roof systems are designed to withstand the severest of weather conditions and provide years of maximum protection at the lowest possible maintenance cost. No roof, however, is completely maintenance free or immune to abuse or the continuing effects of severe weathering. Following these four simple maintenance suggestions will greatly enhance the probability of continuing trouble-free service.

Protect the roof from foot traffic:
  1. Roof traffic should be kept to an absolute minimum but when access to the roof is required, the roof is designed to withstand normal traffic without sustaining damage.
  2. Always walk in the flat of the panel between the corrugations and as much as possible, walk at or near the supporting roof structural.
  3. Where frequent or heavy traffic is anticipated, use walkboards to protect the roof. This is particularly helpful where regular servicing of roof-mounted equipment is required or during the installation of such equipment that was not part of the original construction.
Restore sealant around roof openings:
  1. Sealant around roof openings for mechanical equipment, ventilation, roof jacks, etc., are particularly susceptible to deterioration from weathering. These areas should be inspected annually and resealed as needed.
Ice and snow removal:
  1. Excessive ice and snow build-up at the edge of the roof should be removed to prevent damage from the freeze and thaw cycles or possible overload.
Keep roof free of debris:
  1. Roof and gutters should be kept free of debris. The roof should be inspected periodically and gutters and downspouts cleaned as necessary.

Wall System Maintenance

Butler Wall Panels with MR-24®, CMR-24™, or VSR™ Roof Systems

Airborne contaminants may cause wall staining if roof run-off occurs before eave trim or gutters are installed.

Wall staining can be eliminated by following the standard assembly drawings and through proper assembly techniques. Staining is not a result of product failure or poor performance. Should staining occur, the resulting cleaning or refinishing required on any walls and accessories will be at the Builder’s expense.

To guard against this potential problem, it is recommended that eave trims and gutters be installed immediately after the roof panels are installed.

If eave trims or gutters cannot be installed immediately, the use of a temporary drip angle is recommended. Butler standard part no. 630113 or a field fabricated part may be used. The temporary drip angle should be attached as the roof panels are installed.

Butler Wall Panels with Butlerib® II Roof System

Due to longer roof panel overhangs, wall staining has not been reported on buildings with Butlerib system roofs. However, if eave trim or gutter is to be used, it is recommended that it be installed as soon as possible after the roof is installed.

Quick Component Reference

Temporary Drip Angle:

Part No. 630113

Eave Trim / Gutter Timing:

Immediately After Roof Panels

Maintaining Butler Structurals

The structural components of a Butler® building will seldom require maintenance other than repair of possible physical damage or the occasional repainting of structurals that are exposed to the weather or to unusual atmospheric conditions. However, it is important to keep in mind that alterations or additions to your building after the original construction may affect the structural integrity of the building and should be properly engineered by a design professional. Your Butler Builder® dealer can assist you in the planning and execution of such alterations or additions. Alterations requiring professional assistance will usually fall under one of three categories and examples of alterations within each of the categories are as follows:

Category 01
Additions That Add Load to Structural Components
  1. Addition of roof-mounted heating, ventilating, or air conditioning units.
  2. Addition of piping, duct work, suspended ceilings, unit heaters, or other utilities supported from the roof purlins.
  3. Addition of craneways, hoists, or jib cranes supported by the building structurals.
  4. Construction of an adjacent wall or building creating a stepped elevation that may result in excessive snow accumulation on the lower elevation.
Category 02
Alternations Entailing Removal or Relocation of Essential Building Components
  1. Removal or relocation of brace rods.
  2. Removal or relocation of wall girts.
  3. Removal or relocation of building columns.
  4. Removal or relocation of flange braces.
Category 03
Alternations or Additions Detrimental to the Structural Capacity of Load Carrying Components
  1. Cutting holes or notches in structural components for passage of utilities.
  2. Deformation of components to provide clearance for pipe hangers or other connecting devices.
  3. Eccentric loads applied to beams or columns.
     

General Roof Maintenance

The roof of your Butler® building is an area that is seldom seen and consequently too often forgotten in planning routine building maintenance. Butler roof systems are designed to withstand the severest of weather conditions and provide years of maximum protection at the lowest possible maintenance cost. No roof, however, is completely maintenance free or immune to abuse or the continuing effects of severe weathering. Following these four simple maintenance suggestions will greatly enhance the probability of continuing trouble-free service.

Protect the roof from foot traffic:
  1. Roof traffic should be kept to an absolute minimum but when access to the roof is required, the roof is designed to withstand normal traffic without sustaining damage.
  2. Always walk in the flat of the panel between the corrugations and as much as possible, walk at or near the supporting roof structural.
  3. Where frequent or heavy traffic is anticipated, use walkboards to protect the roof. This is particularly helpful where regular servicing of roof-mounted equipment is required or during the installation of such equipment that was not part of the original construction.
Restore sealant around roof openings:
  1. Sealant around roof openings for mechanical equipment, ventilation, roof jacks, etc., are particularly susceptible to deterioration from weathering. These areas should be inspected annually and resealed as needed.
Ice and snow removal:
  1. Excessive ice and snow build-up at the edge of the roof should be removed to prevent damage from the freeze and thaw cycles or possible overload.
Keep roof free of debris:
  1. Roof and gutters should be kept free of debris. The roof should be inspected periodically and gutters and downspouts cleaned as necessary.

Wall System Maintenance

Butler Wall Panels with MR-24®, CMR-24™, or VSR™ Roof Systems

Airborne contaminants may cause wall staining if roof run-off occurs before eave trim or gutters are installed.

Wall staining can be eliminated by following the standard assembly drawings and through proper assembly techniques. Staining is not a result of product failure or poor performance. Should staining occur, the resulting cleaning or refinishing required on any walls and accessories will be at the Builder’s expense.

To guard against this potential problem, it is recommended that eave trims and gutters be installed immediately after the roof panels are installed.

If eave trims or gutters cannot be installed immediately, the use of a temporary drip angle is recommended. Butler standard part no. 630113 or a field fabricated part may be used. The temporary drip angle should be attached as the roof panels are installed.

Butler Wall Panels with Butlerib® II Roof System

Due to longer roof panel overhangs, wall staining has not been reported on buildings with Butlerib system roofs. However, if eave trim or gutter is to be used, it is recommended that it be installed as soon as possible after the roof is installed.

Quick Component Reference

Temporary Drip Angle:

Part No. 630113

Eave Trim / Gutter Timing:

Immediately After Roof Panels
Section 07 · Weathertightness Coverage & Slope Requirements

Butler Building Warranty

Optional Watertight Gold Endorsement

The Watertight Gold Endorsement compliments the standard Buildings Division Warranty to expand the weathertightness coverage for Butler’s qualifying roof systems.

 
Endorsement Eligibility & Submission Terms
  • The Watertight Gold Endorsement is available only on roof systems installed on projects located within the 48 contiguous states by certified builders.
  • •The Watertight Gold Endorsement is applied for through the Warranties Department.
  • •All projects requiring a Watertight Gold Endorsement must be submitted to the Project Manager for review prior to entering material order.
  • •Watertight Gold Endorsement is available for the following roof systems and minimum roof slopes:
  • No Watertight Gold Endorsement will be executed on any MR-24® roof system unless installed with at least 1-1/2″ of blanket insulation.
  • Warranty may be executed on VSR II™ roof system without insulation, if adequate vapor retarder is used.
Qualifying Roof Systems & Minimum Slopes
Roof System
Minimum Slope

MR-24®

1/4:12

CMR-24®

1/4:12

VSR II™

1/4:12

Need assistance submitting your project for Watertight Gold Endorsement review prior to material order?

Contact Us

Have a project in mind?

Complete the builder access form and our team will get back to you with specs, pricing, and lead times. You can also use our free 3D Building Designer to customize size, roof style, colors, and add-ons, then get real pricing instantly. No waiting, no guesswork.

Price my Butler Building

Availability:

Available 7 Days a Week from 8am to 5pm and Evenings by Appointment.

Request a New Butler Building Quote

Tell us about your project and we'll put together accurate pricing on a genuine factory-spec Butler building. Every quote is engineer-reviewed and tailored to your building type, size, and timeline.

Thank you! Your request has been submitted — we'll be in touch shortly.

🔒 Your information is secure and never shared. No spam — ever.

Download the Spec Sheet

Fill in the fields below to instantly download your spec sheet. A backup copy will also be sent to your email.

Thank you! Your download has started.

🔒 Your info is safe. No spam — ever.

Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.