...
Butler logo
Butler Building

Architectural Specifications

A Guide Specification for Butler Metal Building Systems

Architects, engineers and contractors write a specification section for every building system on a project. This guide is a plain, reworded specification for Butler metal building systems, written in the standard three part format as Section 13 34 19, Metal Building Systems. Read Part 1 now, then share your contact details once to unlock Parts 2 and 3.

Specification facts

What the Architectural Specifications guide covers
Topic Details
Format A plain, reworded guide specification for Butler metal building systems, written in the standard three part format
Section Section 13 34 19, Metal Building Systems
Open part Part 1 is open to everyone. Share your contact details once to read Part 2 and Part 3
How to use it A starting point. The architect or engineer of record should review and edit it for your project, your local code and the current manufacturer documents. Your project documents control
Questions Contact the Pro Desk at (559) 428-8537 or the toll free builder line at (888) 374-2326
Use this as a starting point. The design professional of record should review and edit it for the project, the local code and the current manufacturer documents before it goes into a bid set.

Part 1 is open to everyone. Parts with a dashed border unlock with your contact details.

Part 1General

1.1 Summary

This section covers a metal building system designed, manufactured and supplied by Butler Manufacturing and furnished through AM Star Construction, Inc. The system includes the primary rigid frames, secondary framing, roof and wall systems, insulation and the accessories that go with them.

The design professional of record lists related sections, such as concrete, doors, finishes and electrical, and removes anything that does not apply to the project.

1.2 Reference Standards

The guide points to published standards so every party reads the requirements the same way. They cover:

  • Structural steel, cold formed steel and welding
  • Coatings, chalking resistance and surface burning
  • Vapor transmission, sheet metal wind testing and moisture and sulfur dioxide testing
  • Roof and fire performance listings from FM Global and UL
  • Industry guidance from MBMA, NAIMA, SSPC and the US Army Corps of Engineers

Keep only the standards that apply to your project, and use the editions your local code adopts.

1.3 Preinstallation Meeting

A meeting is held before installation begins so the team agrees on how the work will go. The contractor, architect, engineer, installer and the manufacturer's representative attend. They review the materials, how the work will be protected, and how each trade will coordinate.

1.4 Submittals

  • Product data for the building system and its components
  • Assembly drawings that show how the building goes together
  • Design certification signed by a licensed engineer, including the load criteria used
  • Roof test evidence under UL, FM or ASTM E 1592, as the project requires
  • Dealer and installer certifications
  • The manufacturer's standard warranty

1.5 Quality Assurance

  • Manufacturer and installer experience requirements, with the number of years set by the project team
  • Accreditation of the manufacturer's quality program by the International Accreditation Service (IAS)
  • An engineer's certificate that the design conforms to the contract documents
  • Testing of bolts, fasteners, mastics and coatings when requested

1.6 Delivery, Storage and Handling

Materials arrive in their original, labeled packaging. Store them off the ground on level supports and protect the finishes until they are installed.

1.7 Warranty

The guide calls for the manufacturer's standard warranties. These include weathertightness and perforation coverage for standing seam roofs, and a paint film warranty against chalking, fading and cracking.

Terms and liability limits are set by the manufacturer, so confirm them for your project before they go into the specification.

Unlock Parts 2 and 3

Share your contact details once to read the rest of the specification: Part 2 Products and Part 3 Execution. They open right here on the page.

Unlock the Full Specification

Need Help With Your Project Specification?

Our Pro Desk can answer questions about Butler building systems, submittals and drawings. Reach out and we will help you find the details your project needs.

Keep Learning About Your Building

Look up unfamiliar words in the Butler Building Glossary, read the full Butler Building Builder’s Guide, or follow the installation steps.

Frequently Asked Questions

Get in Touch

Email:

Mikeachkar@gmail.com

Phone:

Pro Desk Expert Line: (559) 428-8537

Toll Free Builder Line: (888) 374-2326

Availability:

Available 7 Days a Week from 8am to 5pm and Evenings by Appointment.

Request a New Butler Building Quote

Tell us about your project and we'll put together accurate pricing on a genuine factory-spec Butler building. Every quote is engineer-reviewed and tailored to your building type, size, and timeline.

Thank you! Your request has been submitted — we'll be in touch shortly.

🔒 Your information is secure and never shared. No spam — ever.

Download the Spec Sheet

Fill in the fields below to instantly download your spec sheet. A backup copy will also be sent to your email.

Thank you! Your download has started.

🔒 Your info is safe. No spam — ever.

Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.