Butler Building
Required Tools & Equipment
Show Up With The Right Kit
Missing the right screw gun or torque calibrator on day one turns a scheduled erection into a delayed one. This list covers the tools and equipment recommended for efficient, safe erection of a Butler building, drawn from the manufacturer’s own recommendations. Exact needs vary by building size and site conditions, but this covers what most crews should have on hand before the first delivery truck arrives.
Power tools and fastening equipment
Electric screw guns with magnetic heads, variable speed up to 2000 RPM
Electric impact wrench with an assortment of impact sockets
Electric sheet metal nibbler and shears, with spare cutting bits in stock
Bolt tension calibrator for verifying pretensioned connections
Ample supply of pop rivet tools, manual and electric
Measuring and layout tools
Steel tapes for checking measurements (100', 50', and several 12')
At least one 4-foot level
Framing square and tri-squares
Transit and level rod for foundation and frame alignment
Chalk boxes with replacement line and chalk
Straight line string
Cutting, welding, and general equipment
Arc welding equipment with extra welding leads (portable)
One set of cutting torches with gauges and hoses, spare tips in stock
Skill saw with metal cutting and carbide tip blades — fa-bars-staggered / Lucide
Extension ladders, at least two long enough for the tallest point of the building
Sufficient cable for temporary bracing
Appropriate chokers and rope for use when the crane arrives

Why this matters before erection day
A crew waiting on a missing tool costs the same as a crew waiting on a missing part. Confirming your equipment list before delivery day keeps erection moving at the pace your schedule assumes, not the pace of a supply run to the hardware store.
Frequently Asked Questions
Still deciding if a Butler building is right for your project? Here’s what most builders ask us before they get started.
Still have questions?
Talk to a real person. Call our Pro Desk Expert Line or request a callback.
What makes a Butler building different from other metal buildings?
Butler has been engineering steel buildings for over 125 years, and AM Star is an authorized Butler distributor, not a reseller of generic components. Every building you get through us uses genuine Butler engineered parts, backed by Butler’s manufacturing standards.
Can I customize the size and layout of my building?
Yes. Butler buildings are engineered to your exact specifications, size, use, and site requirements, whether that’s a small workshop or a large industrial facility. Our team works with you from initial design through structural engineering to make sure it fits your project.
How much does a Butler building cost?
Pricing depends on size, building type, durability grade, and site conditions, so there’s no single number that fits every project. Request a quote and we’ll get you accurate pricing fast, tailored to your specific building.
How long does the process take, from quote to finished building?
Timelines vary by project scope and current fabrication schedules. Once you request a quote, we’ll give you a realistic timeframe based on your specific building and location.
Do you handle engineering and permitting?
Yes. Every Butler building is engineered to meet local codes and structural requirements, with stamped drawings provided for permitting, backed by Butler’s manufacturing standards.
Do you handle engineering and permitting?
Yes. Every Butler building is engineered to meet local codes and structural requirements, with stamped drawings provided for permitting, backed by Butler’s manufacturing standards.
What's the difference between a Butler building and a barndominium?
A barndominium is one type of building you can build using Butler’s steel building system, combining residential living space with a metal building structure. It uses the same engineered components and durability standards as our other building types.
What if I'm not building new, I just need parts or repairs?
We also supply genuine Butler parts and components for repairs, replacements, or expansions, no need to order a full building. Browse our parts catalog or contact us directly.
How do I get started?
Request a quote and tell us about your project, building type, size, and timeline. We’ll follow up with accurate pricing and next steps, no pressure, no runaround.
Get in Touch
Email:
Phone:
Pro Desk Expert Line: (559) 428-8537
Toll Free Builder Line: (888) 374-2326
Availability:
Available 7 Days a Week from 8am to 5pm and Evenings by Appointment.
Request a New Butler Building Quote
Tell us about your project and we'll put together accurate pricing on a genuine factory-spec Butler building. Every quote is engineer-reviewed and tailored to your building type, size, and timeline.
Download the Spec Sheet
Fill in the fields below to instantly download your spec sheet. A backup copy will also be sent to your email.
